Introduction
What Is TABLE Deck Drophead Slab Formwork System?
Main Components of TABLE Deck Drophead System
- Steel Deck Panels: Main load-bearing surface for concrete pouring
- Drophead Head: Quick-release fitting to realize early stripping
- Secondary Steel Beams: Connect panels and transfer load
- Adjustable Vertical Shore: Height adjustable support post
- Wedge Pins & Lock Clips: Fast connecting accessories for quick assembly
- Head Jack & Base Jack: Fine height adjustment
Key Advantages of TABLE Deck Drophead Slab Formwork
✅ Early Stripping Design
Panels can be stripped 3–7 days after pouring depending on concrete grade. Panels circulate to upper floors rapidly.✅ Lightweight Modular Structure
Single panel weight is manageable for 1–2 workers. No heavy lifting equipment required on site.✅ High Turnover Times
Adopted Q700 high tensile steel with anti-corrosion coating, achieving over 150 reuses under standard operation.
✅ Simple Assembly & Dismantling
Less connecting fittings, mainly fixed by wedge pins. Shorten working hours and reduce labor expenditure.
✅ Excellent Concrete Surface Finish
Flat steel panel ensures smooth slab surface, reduces secondary plastering work.
Fewer panels needed for multi-floor construction due to fast turnover; lower labor and material rental cost.
Compatibility with Scaffolding Systems
- Ringlock Scaffolding
- Kwikstage Scaffolding
- Cuplock Scaffolding
Standard connection size avoids customized transformation, convenient for construction companies with existing scaffolding stock.
Technical Specifications
You can insert specification table here in backend editor
- Panel Material: Q700 High Strength Steel
- Common Panel Sizes: 1200×600mm, 1500×600mm, 1800×600mm
- Shore Adjustable Height: Customized according to floor height
- Allowable Concrete Load: Meet standard commercial building slab load requirements
- Surface Treatment: Electro-galvanized / Spray painting optional
Standard Erection & Early Stripping Steps
- Arrange vertical shores and adjust base jack to target elevation
- Install dropheads on top of shores
- Place secondary beams onto dropheads
- Lay steel deck panels and lock with wedge pins
- Conduct inspection before concrete pouring
- After concrete gains initial strength, unlock drophead wedge
- Lower panels and secondary beams for early stripping
- Transport stripped panels to upper floors for next cycle
- Keep vertical shores until concrete reaches design strength

Typical Application Projects
- Residential apartment slab construction
- Hotel & office commercial buildings
- Underground basement floor
- School and hospital public projects
- Parking lot cast-in-place slabs


Frequently Asked Questions
Q1: How soon can we carry out early stripping?
It depends on local concrete mix design and temperature. Normally stripping can start when concrete strength reaches over 50% of design strength. Please follow engineer’s instruction.Q2: Can the system adapt irregular floor layouts?
Yes. We supply standard and cut-to-size panels to fit non-standard slab dimensions.Q3: Is training provided for site workers?
We can provide detailed assembly drawings and operation manuals. Online technical guidance is available for bulk orders.Get Your Custom Solution